{"id":1118,"date":"2026-02-25T10:36:03","date_gmt":"2026-02-25T10:36:03","guid":{"rendered":"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/"},"modified":"2026-03-02T09:13:23","modified_gmt":"2026-03-02T09:13:23","slug":"agile-story-tracking","status":"publish","type":"docs","link":"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/","title":{"rendered":"Tracking Progress Through Visual Dashboards"},"content":{"rendered":"<p>Agile story tracking isn\u2019t just about checking boxes. It\u2019s about visibility, accountability, and staying aligned with business value. When teams lack clear insight into what\u2019s happening with their stories, work can stall, priorities drift, and delivery becomes unpredictable.<\/p>\n<p>Too often, progress is assumed rather than measured. Teams rely on gut feelings or end-of-sprint reports that miss early warning signs. This delay leads to surprises\u2014rework, missed deadlines, and frustrated stakeholders.<\/p>\n<p>I\u2019ve seen teams where story dashboards transformed their rhythm. One product owner told me, \u201cFor the first time, I could see why velocity dropped\u2014not because people weren\u2019t working, but because stories were getting stuck in testing.\u201d That kind of insight is priceless.<\/p>\n<p>This chapter guides you through building and interpreting story dashboards that reflect real work flow. You\u2019ll learn how to track progress with precision, spot bottlenecks early, and use agile metrics flow to improve delivery predictability. You\u2019ll gain tools that work with any Agile framework\u2014Scrum, Kanban, or hybrid.<\/p>\n<h2>Why Dashboards Matter in Agile Delivery<\/h2>\n<p>Visual dashboards are the heartbeat of Agile transparency. They turn abstract progress into tangible, actionable insights.<\/p>\n<p>Without them, the backlog becomes a black box. Teams may know what\u2019s \u201cdone,\u201d but not why something isn\u2019t moving. Dashboards close that gap.<\/p>\n<p>They serve three critical roles:<\/p>\n<ul>\n<li><strong>Monitor flow<\/strong> \u2014 See how stories move from backlog to done.<\/li>\n<li><strong>Identify bottlenecks<\/strong> \u2014 Pinpoint where work accumulates, like in testing or review.<\/li>\n<li><strong>Support decisions<\/strong> \u2014 Use data to adjust capacity, refine planning, or re-prioritize.<\/li>\n<\/ul>\n<p>These aren\u2019t theoretical benefits. I\u2019ve worked with teams where a simple control chart revealed that 40% of stories were delayed by unclear acceptance criteria\u2014something that had gone unnoticed for months.<\/p>\n<h3>What Makes a Good Story Dashboard?<\/h3>\n<p>A strong dashboard isn\u2019t just a display of numbers. It must answer the right questions.<\/p>\n<p>Consider these criteria:<\/p>\n<ul>\n<li><strong>Updates in real time<\/strong> \u2014 No manual reloads. Data should reflect the current state.<\/li>\n<li><strong>Clear visual hierarchy<\/strong> \u2014 Use color coding, trend lines, and sorting to make insights pop.<\/li>\n<li><strong>Focus on flow<\/strong> \u2014 Highlight process steps, cycle time, and work-in-progress limits.<\/li>\n<li><strong>Team ownership<\/strong> \u2014 The team should maintain and interpret the dashboard, not just consume it.<\/li>\n<\/ul>\n<p>One team I coached replaced their old burndown chart with a cumulative flow diagram. Within two sprints, they noticed work-in-progress spikes in \u201cReview.\u201d That led them to implement paired code reviews\u2014cuts in rework, faster delivery.<\/p>\n<h2>Key Metrics for Agile Story Tracking<\/h2>\n<p>Not every number is useful. Focus on metrics that reflect true workflow health.<\/p>\n<p>Here are the top five agile metrics flow indicators:<\/p>\n<table>\n<tbody>\n<tr>\n<th>Metric<\/th>\n<th>What It Measures<\/th>\n<th>Why It Matters<\/th>\n<\/tr>\n<tr>\n<td>Cycle Time<\/td>\n<td>Time from start to finish of a story<\/td>\n<td>Reveals process efficiency and predictability<\/td>\n<\/tr>\n<tr>\n<td>Lead Time<\/td>\n<td>Time from backlog entry to delivery<\/td>\n<td>Shows how long stories wait before work begins<\/td>\n<\/tr>\n<tr>\n<td>Work-in-Progress (WIP) Limits<\/td>\n<td>Number of stories in each workflow stage<\/td>\n<td>Prevents overloading teams and identifies bottlenecks<\/td>\n<\/tr>\n<tr>\n<td>Cumulative Flow Diagram (CFD)<\/td>\n<td>Visual flow of stories across stages over time<\/td>\n<td>Highlights process stability and cycle time trends<\/td>\n<\/tr>\n<tr>\n<td>Throughput<\/td>\n<td>Number of stories completed per sprint<\/td>\n<td>Measures team output and predicts future capacity<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>These metrics work best when combined. A CFD with WIP limits shows what\u2019s slowing things down. Lead time spikes indicate backlog grooming issues. Low throughput with high cycle time? That\u2019s a sign of technical debt or unclear acceptance criteria.<\/p>\n<h2>Designing Your Story Dashboard<\/h2>\n<p>Start simple. A dashboard should answer one question: \u201cWhere is our work?\u201d<\/p>\n<p>Here\u2019s a step-by-step approach:<\/p>\n<ol>\n<li><strong>Define your goal<\/strong> \u2014 Are you tracking delivery speed? Finding bottlenecks? Improving predictability?<\/li>\n<li><strong>Map your workflow<\/strong> \u2014 Use swimlanes: Backlog \u2192 In Progress \u2192 Review \u2192 Testing \u2192 Done.<\/li>\n<li><strong>Set WIP limits<\/strong> \u2014 Limit each column to avoid overload. 3 stories maximum in \u201cTesting\u201d is a good starting point.<\/li>\n<li><strong>Integrate real-time data<\/strong> \u2014 Ensure the system updates when a story moves stages.<\/li>\n<li><strong>Review weekly<\/strong> \u2014 Use the sprint review to discuss trends, not just results.<\/li>\n<li><strong>Iterate the dashboard<\/strong> \u2014 Adjust based on feedback. A dashboard that no one uses is worse than no dashboard at all.<\/li>\n<\/ol>\n<p>One product owner I worked with built a dashboard with only three metrics: average cycle time, throughput, and WIP. After six weeks, the team began optimizing their workflow using those numbers\u2014without needing a full report.<\/p>\n<h3>Avoiding Dashboard Overload<\/h3>\n<p>Too many charts confuse more than they clarify. Focus on what drives action.<\/p>\n<p>Common mistakes:<\/p>\n<ul>\n<li>Showing every story with status icons \u2014 leads to visual noise.<\/li>\n<li>Overloading with metrics \u2014 more than five key data points distracts.<\/li>\n<li>Using outdated or manual updates \u2014 undermines trust.<\/li>\n<li>Ignoring team feedback \u2014 the dashboard becomes a management tool, not a team one.<\/li>\n<\/ul>\n<p>Prioritize clarity over completeness.<\/p>\n<h2>Using Agile Metrics Flow to Improve Delivery<\/h2>\n<p>Agile metrics flow isn\u2019t about chasing numbers. It\u2019s about learning from patterns.<\/p>\n<p>For example, if cycle time increases over three sprints while throughput stays flat, something\u2019s off. Dig deeper: Is technical debt growing? Are stories being split too late? Are acceptance criteria changing mid-sprint?<\/p>\n<p>One team noticed that stories with acceptance criteria written in the acceptance test step format were moving 20% faster. They began requiring that format for all new stories. The result? Fewer reworks, clearer handoffs.<\/p>\n<p>Another team used a dashboard that tracked story size vs. cycle time. They found that stories larger than 5 points took 60% longer to complete. This led them to enforce a \u201csplit if over 5\u201d rule\u2014cutting cycle time by 40% in two sprints.<\/p>\n<p>These insights aren\u2019t found in spreadsheets. They emerge from consistent tracking and shared ownership of the dashboard.<\/p>\n<h2>Frequently Asked Questions<\/h2>\n<h3>How often should I update my story dashboard?<\/h3>\n<p>Daily updates are ideal. Many tools auto-update, but if you&#8217;re using manual tracking, update it at the end of each workday. The goal is to reflect real progress, not backlog status.<\/p>\n<h3>Can I use story dashboards in Kanban?<\/h3>\n<p>Absolutely. Kanban thrives on flow. Use cumulative flow diagrams (CFD) to visualize story movement across stages. WIP limits are central to Kanban, so make sure your dashboard displays those clearly.<\/p>\n<h3>What if my team disagrees on what \u201cDone\u201d means?<\/h3>\n<p>Go back to your Definition of Done. Use the dashboard to highlight stories that are \u201cdone\u201d in title only. This forces discussion and alignment. Over time, your team will refine \u201cDone\u201d through data, not debate.<\/p>\n<h3>Do I need a separate dashboard for each team?<\/h3>\n<p>No. For large products, use a single dashboard with team segments. This shows cross-team dependencies and helps align releases. But keep the focus on team-level flow\u2014don\u2019t mix metrics across teams.<\/p>\n<h3>How long until I see value from a story dashboard?<\/h3>\n<p>With consistent updates, you\u2019ll see patterns in 2\u20133 sprints. The real value comes from acting on insights\u2014like reducing WIP or splitting stories early.<\/p>\n<h3>Can story dashboards improve stakeholder trust?<\/h3>\n<p>Yes. When stakeholders see predictable delivery, transparency, and early warnings, trust grows. A dashboard showing stable throughput and decreasing cycle time reassures them that the team is in control.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Agile story tracking isn\u2019t just about checking boxes. It\u2019s about visibility, accountability, and staying aligned with business value. When teams lack clear insight into what\u2019s happening with their stories, work can stall, priorities drift, and delivery becomes unpredictable. Too often, progress is assumed rather than measured. Teams rely on gut feelings or end-of-sprint reports that [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":1115,"menu_order":2,"template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"doc_tag":[],"class_list":["post-1118","docs","type-docs","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Agile Story Tracking for Real-Time Progress<\/title>\n<meta name=\"description\" content=\"Master agile story tracking with visual dashboards to monitor progress, identify blockers, and optimize flow. Learn how story dashboards and agile metrics flow improve team transparency and delivery predictability.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/\" \/>\n<meta property=\"og:locale\" content=\"id_ID\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Agile Story Tracking for Real-Time Progress\" \/>\n<meta property=\"og:description\" content=\"Master agile story tracking with visual dashboards to monitor progress, identify blockers, and optimize flow. Learn how story dashboards and agile metrics flow improve team transparency and delivery predictability.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/\" \/>\n<meta property=\"og:site_name\" content=\"Visual Paradigm Skills Indonesia\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-02T09:13:23+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimasi waktu membaca\" \/>\n\t<meta name=\"twitter:data1\" content=\"6 menit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/\",\"url\":\"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/\",\"name\":\"Agile Story Tracking for Real-Time Progress\",\"isPartOf\":{\"@id\":\"https:\/\/skills.visual-paradigm.com\/id\/#website\"},\"datePublished\":\"2026-02-25T10:36:03+00:00\",\"dateModified\":\"2026-03-02T09:13:23+00:00\",\"description\":\"Master agile story tracking with visual dashboards to monitor progress, identify blockers, and optimize flow. Learn how story dashboards and agile metrics flow improve team transparency and delivery predictability.\",\"breadcrumb\":{\"@id\":\"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/#breadcrumb\"},\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/skills.visual-paradigm.com\/id\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Write Effective User Stories\",\"item\":\"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"From Story to Delivery\",\"item\":\"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Tracking Progress Through Visual Dashboards\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/skills.visual-paradigm.com\/id\/#website\",\"url\":\"https:\/\/skills.visual-paradigm.com\/id\/\",\"name\":\"Visual Paradigm Skills Indonesia\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/skills.visual-paradigm.com\/id\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/skills.visual-paradigm.com\/id\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"id\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/skills.visual-paradigm.com\/id\/#organization\",\"name\":\"Visual Paradigm Skills Indonesia\",\"url\":\"https:\/\/skills.visual-paradigm.com\/id\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\/\/skills.visual-paradigm.com\/id\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/skills.visual-paradigm.com\/id\/wp-content\/uploads\/sites\/7\/2026\/02\/favicon.svg\",\"contentUrl\":\"https:\/\/skills.visual-paradigm.com\/id\/wp-content\/uploads\/sites\/7\/2026\/02\/favicon.svg\",\"width\":70,\"height\":70,\"caption\":\"Visual Paradigm Skills Indonesia\"},\"image\":{\"@id\":\"https:\/\/skills.visual-paradigm.com\/id\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Agile Story Tracking for Real-Time Progress","description":"Master agile story tracking with visual dashboards to monitor progress, identify blockers, and optimize flow. Learn how story dashboards and agile metrics flow improve team transparency and delivery predictability.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/","og_locale":"id_ID","og_type":"article","og_title":"Agile Story Tracking for Real-Time Progress","og_description":"Master agile story tracking with visual dashboards to monitor progress, identify blockers, and optimize flow. Learn how story dashboards and agile metrics flow improve team transparency and delivery predictability.","og_url":"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/","og_site_name":"Visual Paradigm Skills Indonesia","article_modified_time":"2026-03-02T09:13:23+00:00","twitter_card":"summary_large_image","twitter_misc":{"Estimasi waktu membaca":"6 menit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/","url":"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/","name":"Agile Story Tracking for Real-Time Progress","isPartOf":{"@id":"https:\/\/skills.visual-paradigm.com\/id\/#website"},"datePublished":"2026-02-25T10:36:03+00:00","dateModified":"2026-03-02T09:13:23+00:00","description":"Master agile story tracking with visual dashboards to monitor progress, identify blockers, and optimize flow. Learn how story dashboards and agile metrics flow improve team transparency and delivery predictability.","breadcrumb":{"@id":"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/#breadcrumb"},"inLanguage":"id","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/agile-story-tracking\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skills.visual-paradigm.com\/id\/"},{"@type":"ListItem","position":2,"name":"How to Write Effective User Stories","item":"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/"},{"@type":"ListItem","position":3,"name":"From Story to Delivery","item":"https:\/\/skills.visual-paradigm.com\/id\/docs\/how-to-write-effective-user-stories\/user-story-delivery\/"},{"@type":"ListItem","position":4,"name":"Tracking Progress Through Visual Dashboards"}]},{"@type":"WebSite","@id":"https:\/\/skills.visual-paradigm.com\/id\/#website","url":"https:\/\/skills.visual-paradigm.com\/id\/","name":"Visual Paradigm Skills Indonesia","description":"","publisher":{"@id":"https:\/\/skills.visual-paradigm.com\/id\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skills.visual-paradigm.com\/id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"id"},{"@type":"Organization","@id":"https:\/\/skills.visual-paradigm.com\/id\/#organization","name":"Visual Paradigm Skills Indonesia","url":"https:\/\/skills.visual-paradigm.com\/id\/","logo":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/skills.visual-paradigm.com\/id\/#\/schema\/logo\/image\/","url":"https:\/\/skills.visual-paradigm.com\/id\/wp-content\/uploads\/sites\/7\/2026\/02\/favicon.svg","contentUrl":"https:\/\/skills.visual-paradigm.com\/id\/wp-content\/uploads\/sites\/7\/2026\/02\/favicon.svg","width":70,"height":70,"caption":"Visual Paradigm Skills Indonesia"},"image":{"@id":"https:\/\/skills.visual-paradigm.com\/id\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/skills.visual-paradigm.com\/id\/wp-json\/wp\/v2\/docs\/1118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skills.visual-paradigm.com\/id\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skills.visual-paradigm.com\/id\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skills.visual-paradigm.com\/id\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/skills.visual-paradigm.com\/id\/wp-json\/wp\/v2\/docs\/1118\/revisions"}],"predecessor-version":[{"id":2426,"href":"https:\/\/skills.visual-paradigm.com\/id\/wp-json\/wp\/v2\/docs\/1118\/revisions\/2426"}],"up":[{"embeddable":true,"href":"https:\/\/skills.visual-paradigm.com\/id\/wp-json\/wp\/v2\/docs\/1115"}],"wp:attachment":[{"href":"https:\/\/skills.visual-paradigm.com\/id\/wp-json\/wp\/v2\/media?parent=1118"}],"wp:term":[{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skills.visual-paradigm.com\/id\/wp-json\/wp\/v2\/doc_tag?post=1118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}