{"id":875,"date":"2026-02-25T10:26:05","date_gmt":"2026-02-25T10:26:05","guid":{"rendered":"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/"},"modified":"2026-02-25T10:26:05","modified_gmt":"2026-02-25T10:26:05","slug":"epc-modeling-guide-defining-events-functions","status":"publish","type":"docs","link":"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/","title":{"rendered":"Starting Simple: Defining Events and Functions Effectively"},"content":{"rendered":"<p>Every business process begins with a trigger \u2014 a moment something changes. In EPC modeling, that moment is an event. Getting events and functions right from the start prevents confusion, misalignment, and wasted effort later. A poorly defined event creates ambiguity; a vague function hides responsibility. This chapter is not about complex systems \u2014 it\u2019s about grounding your model in reality.<\/p>\n<p>Over two decades of modeling enterprise systems has taught me: clarity isn\u2019t about complexity. It\u2019s about precision. The goal isn\u2019t to capture every detail upfront \u2014 it\u2019s to build a foundation that anyone can follow. Whether you&#8217;re modeling an order entry flow or an HR onboarding sequence, the logic remains the same.<\/p>\n<p>This guide walks you through identifying real-world events and translating business actions into precise EPC functions. You\u2019ll learn how to avoid common pitfalls, how to apply naming rules that stick, and how to build a simple EPC process that tells a clear story.<\/p>\n<h2>What Are EPC Events? The Heart of Process Triggering<\/h2>\n<p>An event in an EPC is a moment when a business situation changes. It\u2019s not a task \u2014 it\u2019s a state shift. Think: \u201cAn order was received.\u201d That\u2019s an event. Not \u201cReceive order,\u201d which is a function.<\/p>\n<p>Events are always **state changes** \u2014 a confirmation, a rejection, a deadline passed. They mark the start or end of a process, or a point where a decision must be made.<\/p>\n<p>Here\u2019s how to identify a true EPC event:<\/p>\n<ul>\n<li>Ask: \u201cIs this an occurrence that can be confirmed as happened?\u201d<\/li>\n<li>Use past tense: \u201cPayment received,\u201d \u201cInvoice approved,\u201d \u201cCustomer registered.\u201d<\/li>\n<li>Ensure it\u2019s observable and measurable \u2014 not subjective.<\/li>\n<\/ul>\n<p>Common examples of EPC events:<\/p>\n<ul>\n<li>Customer places order<\/li>\n<li>Payment received<\/li>\n<li>Invoice generated<\/li>\n<li>Employee onboarding completed<\/li>\n<li>Deadline expired<\/li>\n<\/ul>\n<p>When you\u2019re unsure, ask: \u201cWould this trigger a next step?\u201d If yes, it\u2019s likely an event.<\/p>\n<h3>Common Mistakes in Defining EPC Events<\/h3>\n<p>Even experienced modelers fall into traps. Watch out for:<\/p>\n<ul>\n<li><strong>Using verbs as events:<\/strong> \u201cSubmit application\u201d \u2014 this is a function. \u201cApplication submitted\u201d is an event.<\/li>\n<li><strong>Overloading events:<\/strong> \u201cOrder processed\u201d \u2014 too vague. Better: \u201cOrder confirmed\u201d or \u201cOrder shipped.\u201d<\/li>\n<li><strong>Missing triggers:<\/strong> Not capturing key events like \u201cCustomer canceled order\u201d can break logic.<\/li>\n<\/ul>\n<p>Remember: Events are <em>what happens<\/em>. They\u2019re the milestones.<\/p>\n<h2>What Are EPC Functions? The Actions That Drive Change<\/h2>\n<p>Functions are the <em>actions<\/em> that transform one state into another. They\u2019re the tasks that <strong>cause<\/strong> an event to happen.<\/p>\n<p>Unlike events, functions are verbs in the <strong>infinitive form<\/strong> or passive voice. They\u2019re not states \u2014 they\u2019re activities.<\/p>\n<p>Consider this simple flow:<\/p>\n<p><strong>Event:<\/strong> Customer places order<\/p>\n<p><strong>Function:<\/strong> Validate customer details<\/p>\n<p><strong>Event:<\/strong> Validation successful<\/p>\n<p>Here, \u201cValidate customer details\u201d is a function \u2014 it\u2019s the action that leads to a new state.<\/p>\n<h3>Key Rules for Writing EPC Functions<\/h3>\n<ol>\n<li><strong>Start with a verb:<\/strong> \u201cProcess order,\u201d \u201cSend confirmation email,\u201d \u201cApprove invoice.\u201d<\/li>\n<li><strong>Be specific:<\/strong> \u201cProcess order\u201d is okay. \u201cProcess order within 24 hours\u201d is better.<\/li>\n<li><strong>One action per function:<\/strong> Avoid \u201cReview and approve\u201d \u2014 split into \u201cReview application\u201d and \u201cApprove application.\u201d<\/li>\n<\/ol>\n<p>Using precise language ensures that roles, systems, and responsibilities are clear \u2014 a must for later process ownership.<\/p>\n<h3>EPC Function Examples in Real Processes<\/h3>\n<p>Here are practical EPC function examples from real business scenarios:<\/p>\n<ul>\n<li>Generate invoice from order<\/li>\n<li>Check credit limit<\/li>\n<li>Assign task to regional team<\/li>\n<li>Update customer status to \u201cActive\u201d<\/li>\n<li>Send welcome email to new employee<\/li>\n<\/ul>\n<p>Each of these is a distinct, actionable step \u2014 not a state. This distinction is critical.<\/p>\n<h2>Building a Simple EPC Process: Step-by-Step<\/h2>\n<p>Let\u2019s walk through a simple EPC process: <strong>Customer order fulfillment<\/strong>.<\/p>\n<p>Start with a single, clear goal: \u201cDeliver order to customer.\u201d Then, identify the key events and functions.<\/p>\n<h3>Step 1: Identify the Start Event<\/h3>\n<p>Begin with: <strong>Customer places order<\/strong><\/p>\n<h3>Step 2: Add the First Function<\/h3>\n<p>Next: <strong>Validate customer details<\/strong><\/p>\n<h3>Step 3: Identify the Resulting Event<\/h3>\n<p>Then: <strong>Validation successful<\/strong><\/p>\n<h3>Step 4: Add the Next Function<\/h3>\n<p>Then: <strong>Check inventory availability<\/strong><\/p>\n<h3>Step 5: Add the Next Event<\/h3>\n<p>Then: <strong>Inventory available<\/strong><\/p>\n<h3>Step 6: Add Final Function and End Event<\/h3>\n<p>Then: <strong>Ship order<\/strong><\/p>\n<p>End: <strong>Order delivered<\/strong><\/p>\n<p>Now you have a simple EPC process flow that\u2019s logical, readable, and grounded in business reality.<\/p>\n<h2>Logical Operators: What to Use and When<\/h2>\n<p>Every EPC model will eventually need decision points. This is where logical operators \u2014 <strong>AND<\/strong>, <strong>OR<\/strong>, and <strong>XOR<\/strong> \u2014 come in.<\/p>\n<p>Use them to model:<\/p>\n<ul>\n<li><strong>XOR:<\/strong> One and only one path must be taken (e.g., \u201cPayment method selected: Credit Card OR PayPal\u201d)<\/li>\n<li><strong>AND:<\/strong> All paths must be completed (e.g., \u201cApprove order AND notify warehouse\u201d)<\/li>\n<li><strong>OR:<\/strong> One or more paths may be taken (e.g., \u201cSend email OR send SMS notification\u201d)<\/li>\n<\/ul>\n<p>Use AND gates to model parallel tasks. Use XOR to model mutual exclusivity. Use OR for optional paths.<\/p>\n<p>Keep it simple. Too many logical branches create complexity. Aim for no more than 3\u20134 paths per decision point.<\/p>\n<h2>Best Practices for EPC Clarity<\/h2>\n<p>Even a simple EPC process must be readable by people outside the team.<\/p>\n<p>Here\u2019s a checklist to ensure your EPC modeling guide delivers clarity:<\/p>\n<ul>\n<li><strong>Use consistent tense:<\/strong> Events in past tense, functions in present or infinitive.<\/li>\n<li><strong>Label with clarity, not jargon:<\/strong> \u201cProcess invoice\u201d &gt; \u201cProcess invoice (PO-12345)\u201d<\/li>\n<li><strong>Group related elements:<\/strong> Cluster events and functions by business phase.<\/li>\n<li><strong>Use Visual Paradigm\u2019s auto-layout:<\/strong> Helps maintain clean, readable alignment.<\/li>\n<li><strong>Review with a non-expert:<\/strong> If they can\u2019t follow the flow, simplify.<\/li>\n<\/ul>\n<h2>Why This Matters: The Long-Term Impact of Clear Modeling<\/h2>\n<p>When you define EPC events and functions correctly, you\u2019re not just drawing a diagram \u2014 you\u2019re building a shared understanding. This model becomes the basis for automation, audit trails, and system integration.<\/p>\n<p>I\u2019ve seen teams spend weeks rewriting processes because a single event was mislabeled. The cost? Delayed projects, wrong system designs, and stakeholder frustration.<\/p>\n<p>Take the time now to define events and functions with care. It\u2019s the single best investment you can make in the quality of your EPC diagrams.<\/p>\n<h2>Frequently Asked Questions<\/h2>\n<h3>What is the difference between an EPC event and a function?<\/h3>\n<p>An EPC event is a <strong>state change<\/strong> \u2014 it confirms something has happened (e.g., \u201cOrder received\u201d). An EPC function is an <strong>action<\/strong> that causes a change (e.g., \u201cProcess order\u201d). Events are milestones; functions are tasks.<\/p>\n<h3>How do I define EPC events for a process with no clear triggers?<\/h3>\n<p>Start by asking: \u201cWhat would cause this process to begin?\u201d Look for external signals \u2014 a customer action, a system alert, a calendar date. If no trigger exists, the process might not be a standalone event chain. Reassess its scope.<\/p>\n<h3>Can I use EPC function examples from other industries?<\/h3>\n<p>Yes \u2014 but tailor them to your context. \u201cSend confirmation email\u201d is a valid example in many fields. However, replace generic terms with your actual process (e.g., \u201cNotify customer of shipment\u201d in logistics).<\/p>\n<h3>What are some simple EPC process examples for beginners?<\/h3>\n<p>Try these: <em>Customer order processing<\/em>, <em>Employee onboarding<\/em>, <em>Invoice approval workflow<\/em>, <em>Service request fulfillment<\/em>. Each starts with a clear event and flows logically through functions to a final outcome.<\/p>\n<h3>How do I avoid overcomplicating a simple EPC process?<\/h3>\n<p>Focus on the core flow. Remove redundant functions. Merge similar steps. Use logical operators only where needed. A well-structured EPC should be understandable in under 30 seconds.<\/p>\n<h3>What tools can I use to model EPC diagrams effectively?<\/h3>\n<p>Visual Paradigm is excellent for beginners and professionals. It supports auto-layout, real-time validation, and export options. Use templates to start quickly and follow best practices built into the tool.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Every business process begins with a trigger \u2014 a moment something changes. In EPC modeling, that moment is an event. Getting events and functions right from the start prevents confusion, misalignment, and wasted effort later. A poorly defined event creates ambiguity; a vague function hides responsibility. This chapter is not about complex systems \u2014 it\u2019s [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":874,"menu_order":0,"template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"doc_tag":[],"class_list":["post-875","docs","type-docs","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Starting Simple: EPC Modeling Guide<\/title>\n<meta name=\"description\" content=\"Learn how to define EPC events and functions effectively with this beginner-friendly EPC modeling guide. Master simple EPC process design for clear, logical business flow modeling.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Starting Simple: EPC Modeling Guide\" \/>\n<meta property=\"og:description\" content=\"Learn how to define EPC events and functions effectively with this beginner-friendly EPC modeling guide. Master simple EPC process design for clear, logical business flow modeling.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/\" \/>\n<meta property=\"og:site_name\" content=\"Visual Paradigm Skills Portugu\u00eas\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"6 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/\",\"url\":\"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/\",\"name\":\"Starting Simple: EPC Modeling Guide\",\"isPartOf\":{\"@id\":\"https:\/\/skills.visual-paradigm.com\/pt\/#website\"},\"datePublished\":\"2026-02-25T10:26:05+00:00\",\"description\":\"Learn how to define EPC events and functions effectively with this beginner-friendly EPC modeling guide. Master simple EPC process design for clear, logical business flow modeling.\",\"breadcrumb\":{\"@id\":\"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/skills.visual-paradigm.com\/pt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"EPC Diagram Fundamentals: A Beginner\u2019s Guide to Process Modeling\",\"item\":\"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Building Your First EPC Models\",\"item\":\"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Starting Simple: Defining Events and Functions Effectively\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/skills.visual-paradigm.com\/pt\/#website\",\"url\":\"https:\/\/skills.visual-paradigm.com\/pt\/\",\"name\":\"Visual Paradigm Skills Portugu\u00eas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/skills.visual-paradigm.com\/pt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/skills.visual-paradigm.com\/pt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/skills.visual-paradigm.com\/pt\/#organization\",\"name\":\"Visual Paradigm Skills Portugu\u00eas\",\"url\":\"https:\/\/skills.visual-paradigm.com\/pt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\/\/skills.visual-paradigm.com\/pt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/skills.visual-paradigm.com\/pt\/wp-content\/uploads\/sites\/9\/2026\/02\/favicon.svg\",\"contentUrl\":\"https:\/\/skills.visual-paradigm.com\/pt\/wp-content\/uploads\/sites\/9\/2026\/02\/favicon.svg\",\"width\":70,\"height\":70,\"caption\":\"Visual Paradigm Skills Portugu\u00eas\"},\"image\":{\"@id\":\"https:\/\/skills.visual-paradigm.com\/pt\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Starting Simple: EPC Modeling Guide","description":"Learn how to define EPC events and functions effectively with this beginner-friendly EPC modeling guide. Master simple EPC process design for clear, logical business flow modeling.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/","og_locale":"pt_PT","og_type":"article","og_title":"Starting Simple: EPC Modeling Guide","og_description":"Learn how to define EPC events and functions effectively with this beginner-friendly EPC modeling guide. Master simple EPC process design for clear, logical business flow modeling.","og_url":"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/","og_site_name":"Visual Paradigm Skills Portugu\u00eas","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"6 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/","url":"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/","name":"Starting Simple: EPC Modeling Guide","isPartOf":{"@id":"https:\/\/skills.visual-paradigm.com\/pt\/#website"},"datePublished":"2026-02-25T10:26:05+00:00","description":"Learn how to define EPC events and functions effectively with this beginner-friendly EPC modeling guide. Master simple EPC process design for clear, logical business flow modeling.","breadcrumb":{"@id":"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/epc-modeling-guide-defining-events-functions\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skills.visual-paradigm.com\/pt\/"},{"@type":"ListItem","position":2,"name":"EPC Diagram Fundamentals: A Beginner\u2019s Guide to Process Modeling","item":"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/"},{"@type":"ListItem","position":3,"name":"Building Your First EPC Models","item":"https:\/\/skills.visual-paradigm.com\/pt\/docs\/epc-diagram-fundamentals\/epc-modeling-tutorial\/"},{"@type":"ListItem","position":4,"name":"Starting Simple: Defining Events and Functions Effectively"}]},{"@type":"WebSite","@id":"https:\/\/skills.visual-paradigm.com\/pt\/#website","url":"https:\/\/skills.visual-paradigm.com\/pt\/","name":"Visual Paradigm Skills Portugu\u00eas","description":"","publisher":{"@id":"https:\/\/skills.visual-paradigm.com\/pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skills.visual-paradigm.com\/pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skills.visual-paradigm.com\/pt\/#organization","name":"Visual Paradigm Skills Portugu\u00eas","url":"https:\/\/skills.visual-paradigm.com\/pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skills.visual-paradigm.com\/pt\/#\/schema\/logo\/image\/","url":"https:\/\/skills.visual-paradigm.com\/pt\/wp-content\/uploads\/sites\/9\/2026\/02\/favicon.svg","contentUrl":"https:\/\/skills.visual-paradigm.com\/pt\/wp-content\/uploads\/sites\/9\/2026\/02\/favicon.svg","width":70,"height":70,"caption":"Visual Paradigm Skills Portugu\u00eas"},"image":{"@id":"https:\/\/skills.visual-paradigm.com\/pt\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/skills.visual-paradigm.com\/pt\/wp-json\/wp\/v2\/docs\/875","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skills.visual-paradigm.com\/pt\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skills.visual-paradigm.com\/pt\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skills.visual-paradigm.com\/pt\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/skills.visual-paradigm.com\/pt\/wp-json\/wp\/v2\/docs\/875\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skills.visual-paradigm.com\/pt\/wp-json\/wp\/v2\/docs\/874"}],"wp:attachment":[{"href":"https:\/\/skills.visual-paradigm.com\/pt\/wp-json\/wp\/v2\/media?parent=875"}],"wp:term":[{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skills.visual-paradigm.com\/pt\/wp-json\/wp\/v2\/doc_tag?post=875"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}