{"id":1339,"date":"2026-02-25T10:39:49","date_gmt":"2026-02-25T10:39:49","guid":{"rendered":"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/"},"modified":"2026-03-02T09:14:31","modified_gmt":"2026-03-02T09:14:31","slug":"pmbok-metrics-project-health","status":"publish","type":"docs","link":"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/","title":{"rendered":"Metrics and Dashboards: Measuring PMBOK Project Health"},"content":{"rendered":"<p>Project health isn\u2019t guessed\u2014it\u2019s measured. I\u2019ve seen teams celebrate on track, only to miss deadlines because they were trusting gut feel instead of data. The right metrics don\u2019t just report status\u2014they reveal risk, expose inefficiencies, and empower leadership decisions.<\/p>\n<p>As a project leader for over two decades, I\u2019ve learned that PMBOK metrics are not about filling reports. They\u2019re about creating visibility. When you align earned value management with your dashboard, you turn abstract progress into actionable intelligence.<\/p>\n<p>This chapter walks you through how to apply earned value management (EVM) within the PMBOK framework to track real project health. You\u2019ll learn how project KPIs PMBOK, when structured right, become the heartbeat of any successful project\u2014no guesswork, just clarity.<\/p>\n<h2>Why PMBOK Metrics Matter in Real Projects<\/h2>\n<p>Project managers often chase status updates like a checklist\u2014but true health comes from data that reflects performance, not just progress.<\/p>\n<p>Consider a software rollout. You\u2019ve delivered 60% of the features. But if the cost to deliver them is 70% of your budget, something\u2019s wrong. That\u2019s where PMBOK metrics step in.<\/p>\n<p>These metrics aren\u2019t just for audits. They\u2019re tools for leadership. They help answer: Is the project on track? Are we spending wisely? Are risks escalating?<\/p>\n<p>Here\u2019s what you gain from this chapter:<\/p>\n<ul>\n<li>How to calculate and interpret earned value (EV), planned value (PV), and actual cost (AC)<\/li>\n<li>How to build a dashboard that visualizes EVM in real time<\/li>\n<li>How to use PMBOK metrics to drive decisions, not just reports<\/li>\n<li>How to identify early warning signs of project failure before they happen<\/li>\n<\/ul>\n<h3>Building a Foundation: The Power of Earned Value Management<\/h3>\n<p>Many confuse earned value with \u201cwork completed.\u201d It\u2019s not. Earned value measures the budgeted cost of work actually completed.<\/p>\n<p>Think of it this way: if your team finishes a task worth $10,000 in value, that\u2019s your earned value\u2014regardless of how much it cost.<\/p>\n<p>That\u2019s the core of EVM: a performance measurement standard that integrates scope, schedule, and cost into a single, coherent view.<\/p>\n<p>Let\u2019s break it down:<\/p>\n<ul>\n<li><strong>Planned Value (PV)<\/strong>: The budgeted cost of work scheduled to be done by now.<\/li>\n<li><strong>Actual Cost (AC)<\/strong>: The real cost to complete the work done so far.<\/li>\n<li><strong>Earned Value (EV)<\/strong>: The budgeted cost of work actually completed.<\/li>\n<\/ul>\n<p>These three values form the foundation of PMBOK metrics. They\u2019re not optional\u2014they\u2019re essential for transparency.<\/p>\n<h3>Calculating PMBOK Performance Indicators<\/h3>\n<p>With PV, AC, and EV in hand, you can compute key performance indicators:<\/p>\n<ul>\n<li><strong>CPI (Cost Performance Index)<\/strong> = EV \/ AC\n<p>&gt; 1.0: Cost efficient<\/p>\n<p>&lt; 1.0: Over budget<\/li>\n<li><strong>SPI (Schedule Performance Index)<\/strong> = EV \/ PV\n<p>&gt; 1.0: Ahead of schedule<\/p>\n<p>&lt; 1.0: Behind schedule<\/li>\n<li><strong>CV (Cost Variance)<\/strong> = EV \u2013 AC\n<p>&gt; 0: Under budget<\/p>\n<p>&lt; 0: Over budget<\/li>\n<li><strong>Schedule Variance<\/strong> = EV \u2013 PV\n<p>&gt; 0: Ahead of schedule<\/p>\n<p>&lt; 0: Behind schedule<\/li>\n<\/ul>\n<p>These aren\u2019t just formulas. They\u2019re early warning systems. A CPI below 0.9, for instance, signals that you\u2019re spending 11% more than planned for each dollar of work.<\/p>\n<p>Don\u2019t ignore the negative signs. I once managed a project where SPI dipped below 0.85 at week 12\u2014despite a \u201chappy\u201d status report. That\u2019s when we discovered scope creep and resource shortages. The metrics saved us from a $250k overrun.<\/p>\n<h2>Designing Your PMBOK Dashboard: From Data to Decision<\/h2>\n<p>Metrics are only useful if you can see them. A well-built dashboard turns EVM data into a visual story.<\/p>\n<p>Here\u2019s what a high-impact PMBOK dashboard includes:<\/p>\n<ul>\n<li>Real-time CPI and SPI trend lines<\/li>\n<li>EV vs. PV to visualize schedule health<\/li>\n<li>Actual vs. planned cost bars<\/li>\n<li>Risk exposure indicators tied to schedule slippage<\/li>\n<li>Color-coded KPIs: green (on track), yellow (caution), red (at risk)<\/li>\n<\/ul>\n<p>Most tools\u2014Excel, Power BI, Smartsheet\u2014can generate this. But the real value comes not in the tool, but in how you use it.<\/p>\n<h3>Step-by-Step: Building a PMBOK Dashboard<\/h3>\n<ol>\n<li><strong>Collect data daily<\/strong>: Track EV, PV, AC per work package or milestone.<\/li>\n<li><strong>Update weekly<\/strong>: Calculate CPI, SPI, and variances.<\/li>\n<li><strong>Visualize progress<\/strong>: Use line charts for EV vs. PV and bar charts for cost variance.<\/li>\n<li><strong>Highlight trends<\/strong>: A downward CPI trend over three weeks? That\u2019s a red flag.<\/li>\n<li><strong>Include KPIs<\/strong>: Set thresholds\u2014e.g., CPI &lt; 0.9 triggers a review.<\/li>\n<\/ol>\n<p>This process isn\u2019t about perfection. It\u2019s about consistency. I\u2019ve seen teams skip this and later blame \u201cpoor planning.\u201d But if you\u2019re not tracking, you\u2019re not managing.<\/p>\n<h3>Common Pitfalls in PMBOK Dashboard Design<\/h3>\n<p>Even the best metrics fail if the dashboard is poorly designed. Here\u2019s what to avoid:<\/p>\n<ul>\n<li><strong>Too many KPIs<\/strong>: Focus on 4\u20136 critical metrics. More than that, and you lose focus.<\/li>\n<li><strong>Ignoring context<\/strong>: A CPI of 0.8 doesn\u2019t mean failure\u2014it means risk. Always pair data with narrative.<\/li>\n<li><strong>Manual updates<\/strong>: If you\u2019re entering numbers by hand, errors creep in. Use automation.<\/li>\n<li><strong>Only showing numbers<\/strong>: Visuals like trend lines, risk heat maps, and Gantt charts make patterns visible.<\/li>\n<\/ul>\n<p>Trust me: a dashboard that only lists numbers is a report. A dashboard that tells a story is a decision engine.<\/p>\n<h2>Integrating PMBOK Metrics with Real-World KPIs<\/h2>\n<p>PMBOK metrics aren\u2019t just for finance. They integrate with broader project KPIs PMBOK to answer strategic questions:<\/p>\n<ul>\n<li>Is the project delivering value on time?<\/li>\n<li>Are we aligned with stakeholder expectations?<\/li>\n<li>Are we at risk of missing key deliverables?<\/li>\n<\/ul>\n<p>Here\u2019s how to link EVM to business outcomes:<\/p>\n<table>\n<tbody>\n<tr>\n<th>PMBOK Metric<\/th>\n<th>Business KPI<\/th>\n<th>What It Means<\/th>\n<\/tr>\n<tr>\n<td>CPI &lt; 0.9<\/td>\n<td>ROI at 12 months<\/td>\n<td>Cost overruns could reduce expected return<\/td>\n<\/tr>\n<tr>\n<td>SPI &lt; 0.9<\/td>\n<td>Time to market<\/td>\n<td>Delays may impact launch window<\/td>\n<\/tr>\n<tr>\n<td>EV &lt; 90% of PV<\/td>\n<td>Stakeholder satisfaction index<\/td>\n<td>Delayed progress may cause dissatisfaction<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>These links turn technical data into strategic insight. That\u2019s how PMBOK metrics become leadership tools\u2014not just compliance boxes.<\/p>\n<h3>When to Escalate: Thresholds That Work<\/h3>\n<p>Not every variance demands action. But knowing when to act does.<\/p>\n<p>Use this decision rule:<\/p>\n<ul>\n<li>CPI &lt; 0.95 or SPI &lt; 0.95 \u2192 Flag for review<\/li>\n<li>CPI &lt; 0.90 or SPI &lt; 0.90 \u2192 Escalate to sponsor<\/li>\n<li>CV &lt; -10% of budget \u2192 Initiate change control<\/li>\n<\/ul>\n<p>This isn\u2019t arbitrary. These thresholds reflect real-world risk. A CPI of 0.92 may be acceptable in early phases, but at 0.88, you\u2019re in crisis territory.<\/p>\n<h2>Case Study: PMBOK Metrics in Action<\/h2>\n<p>Let\u2019s walk through a real-world example from a healthcare IT rollout I managed.<\/p>\n<p>The project had a $1.2M budget and 18-month timeline. By month 10, we had:<\/p>\n<ul>\n<li>EV: $680,000<\/li>\n<li>AC: $720,000<\/li>\n<li>PV: $700,000<\/li>\n<\/ul>\n<p>Results:<\/p>\n<ul>\n<li>CPI = 680,000 \/ 720,000 = 0.94<\/li>\n<li>SPI = 680,000 \/ 700,000 = 0.97<\/li>\n<li>CV = 680,000 \u2013 720,000 = \u2013$40,000<\/li>\n<li>SV = 680,000 \u2013 700,000 = \u2013$20,000<\/li>\n<\/ul>\n<p>The dashboard showed a red flag: behind schedule and over budget. We dug in.<\/p>\n<p>Root cause? Overhead in testing due to poor requirements clarity. We realigned the backlog, added a dedicated QA lead, and revised the schedule. By month 14, CPI improved to 1.03 and SPI to 1.01.<\/p>\n<p>This is the power of PMBOK metrics. Not just tracking\u2014acting.<\/p>\n<h2>Frequently Asked Questions<\/h2>\n<h3>What is the best PMBOK metric for tracking project health?<\/h3>\n<p>CPI and SPI are the most reliable. They combine cost and schedule into one performance signal. Use them together\u2014no single metric tells the whole story.<\/p>\n<h3>How often should I update my PMBOK dashboard?<\/h3>\n<p>Weekly is standard. For high-risk projects, do it daily. The key is consistency. Don\u2019t wait until the end of the month to discover you\u2019re 10% behind.<\/p>\n<h3>Can PMBOK metrics be used in Agile projects?<\/h3>\n<p>Absolutely. Many Agile teams use EVM to track sprint velocity, burn-up charts, and budget health. It\u2019s not about process rigidity\u2014it\u2019s about alignment with business value.<\/p>\n<h3>How do I explain poor CPI to stakeholders?<\/h3>\n<p>Don\u2019t just say \u201cwe\u2019re over budget.\u201d Show the trend. Explain the cause\u2014scope creep, resource gaps, estimation errors. Then present the recovery plan. Transparency builds trust.<\/p>\n<h3>Is earned value management guide necessary for small projects?<\/h3>\n<p>Yes. Even small projects benefit from EVM. It prevents cost surprises. For projects under $50K, you can simplify: track EV, AC, and PV at key milestones.<\/p>\n<p>After 20 years, I still remind myself: metrics are not a report\u2014they\u2019re a reflection of your team\u2019s discipline. When you measure honestly, you build trust. When you act on data, you deliver with confidence.<\/p>\n<p>Now go build your dashboard. Not to impress. To lead.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project health isn\u2019t guessed\u2014it\u2019s measured. I\u2019ve seen teams celebrate on track, only to miss deadlines because they were trusting gut feel instead of data. The right metrics don\u2019t just report status\u2014they reveal risk, expose inefficiencies, and empower leadership decisions. As a project leader for over two decades, I\u2019ve learned that PMBOK metrics are not about [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":1335,"menu_order":3,"template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"doc_tag":[],"class_list":["post-1339","docs","type-docs","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>PMBOK Metrics: Track Project Health<\/title>\n<meta name=\"description\" content=\"Master PMBOK metrics with earned value management guide. Track project health with KPIs, dashboards, and real-time insights for project leaders.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/\" \/>\n<meta property=\"og:locale\" content=\"ru_RU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PMBOK Metrics: Track Project Health\" \/>\n<meta property=\"og:description\" content=\"Master PMBOK metrics with earned value management guide. Track project health with KPIs, dashboards, and real-time insights for project leaders.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/\" \/>\n<meta property=\"og:site_name\" content=\"Visual Paradigm Skills \u0420\u0443\u0441\u0441\u043a\u0438\u0439\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-02T09:14:31+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u041f\u0440\u0438\u043c\u0435\u0440\u043d\u043e\u0435 \u0432\u0440\u0435\u043c\u044f \u0434\u043b\u044f \u0447\u0442\u0435\u043d\u0438\u044f\" \/>\n\t<meta name=\"twitter:data1\" content=\"7 \u043c\u0438\u043d\u0443\u0442\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/\",\"url\":\"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/\",\"name\":\"PMBOK Metrics: Track Project Health\",\"isPartOf\":{\"@id\":\"https:\/\/skills.visual-paradigm.com\/ru\/#website\"},\"datePublished\":\"2026-02-25T10:39:49+00:00\",\"dateModified\":\"2026-03-02T09:14:31+00:00\",\"description\":\"Master PMBOK metrics with earned value management guide. Track project health with KPIs, dashboards, and real-time insights for project leaders.\",\"breadcrumb\":{\"@id\":\"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/#breadcrumb\"},\"inLanguage\":\"ru-RU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/skills.visual-paradigm.com\/ru\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PMBOK Essentials for Beginners\",\"item\":\"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"PMBOK Beyond the Basics\",\"item\":\"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Metrics and Dashboards: Measuring PMBOK Project Health\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/skills.visual-paradigm.com\/ru\/#website\",\"url\":\"https:\/\/skills.visual-paradigm.com\/ru\/\",\"name\":\"Visual Paradigm Skills \u0420\u0443\u0441\u0441\u043a\u0438\u0439\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/skills.visual-paradigm.com\/ru\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/skills.visual-paradigm.com\/ru\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ru-RU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/skills.visual-paradigm.com\/ru\/#organization\",\"name\":\"Visual Paradigm Skills \u0420\u0443\u0441\u0441\u043a\u0438\u0439\",\"url\":\"https:\/\/skills.visual-paradigm.com\/ru\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ru-RU\",\"@id\":\"https:\/\/skills.visual-paradigm.com\/ru\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/skills.visual-paradigm.com\/ru\/wp-content\/uploads\/sites\/10\/2026\/02\/favicon.svg\",\"contentUrl\":\"https:\/\/skills.visual-paradigm.com\/ru\/wp-content\/uploads\/sites\/10\/2026\/02\/favicon.svg\",\"width\":70,\"height\":70,\"caption\":\"Visual Paradigm Skills \u0420\u0443\u0441\u0441\u043a\u0438\u0439\"},\"image\":{\"@id\":\"https:\/\/skills.visual-paradigm.com\/ru\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"PMBOK Metrics: Track Project Health","description":"Master PMBOK metrics with earned value management guide. Track project health with KPIs, dashboards, and real-time insights for project leaders.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/","og_locale":"ru_RU","og_type":"article","og_title":"PMBOK Metrics: Track Project Health","og_description":"Master PMBOK metrics with earned value management guide. Track project health with KPIs, dashboards, and real-time insights for project leaders.","og_url":"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/","og_site_name":"Visual Paradigm Skills \u0420\u0443\u0441\u0441\u043a\u0438\u0439","article_modified_time":"2026-03-02T09:14:31+00:00","twitter_card":"summary_large_image","twitter_misc":{"\u041f\u0440\u0438\u043c\u0435\u0440\u043d\u043e\u0435 \u0432\u0440\u0435\u043c\u044f \u0434\u043b\u044f \u0447\u0442\u0435\u043d\u0438\u044f":"7 \u043c\u0438\u043d\u0443\u0442"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/","url":"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/","name":"PMBOK Metrics: Track Project Health","isPartOf":{"@id":"https:\/\/skills.visual-paradigm.com\/ru\/#website"},"datePublished":"2026-02-25T10:39:49+00:00","dateModified":"2026-03-02T09:14:31+00:00","description":"Master PMBOK metrics with earned value management guide. Track project health with KPIs, dashboards, and real-time insights for project leaders.","breadcrumb":{"@id":"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/#breadcrumb"},"inLanguage":"ru-RU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/pmbok-metrics-project-health\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skills.visual-paradigm.com\/ru\/"},{"@type":"ListItem","position":2,"name":"PMBOK Essentials for Beginners","item":"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/"},{"@type":"ListItem","position":3,"name":"PMBOK Beyond the Basics","item":"https:\/\/skills.visual-paradigm.com\/ru\/docs\/pmbok-essentials-for-beginners\/pmbok-beyond-the-basics\/"},{"@type":"ListItem","position":4,"name":"Metrics and Dashboards: Measuring PMBOK Project Health"}]},{"@type":"WebSite","@id":"https:\/\/skills.visual-paradigm.com\/ru\/#website","url":"https:\/\/skills.visual-paradigm.com\/ru\/","name":"Visual Paradigm Skills \u0420\u0443\u0441\u0441\u043a\u0438\u0439","description":"","publisher":{"@id":"https:\/\/skills.visual-paradigm.com\/ru\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skills.visual-paradigm.com\/ru\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ru-RU"},{"@type":"Organization","@id":"https:\/\/skills.visual-paradigm.com\/ru\/#organization","name":"Visual Paradigm Skills \u0420\u0443\u0441\u0441\u043a\u0438\u0439","url":"https:\/\/skills.visual-paradigm.com\/ru\/","logo":{"@type":"ImageObject","inLanguage":"ru-RU","@id":"https:\/\/skills.visual-paradigm.com\/ru\/#\/schema\/logo\/image\/","url":"https:\/\/skills.visual-paradigm.com\/ru\/wp-content\/uploads\/sites\/10\/2026\/02\/favicon.svg","contentUrl":"https:\/\/skills.visual-paradigm.com\/ru\/wp-content\/uploads\/sites\/10\/2026\/02\/favicon.svg","width":70,"height":70,"caption":"Visual Paradigm Skills \u0420\u0443\u0441\u0441\u043a\u0438\u0439"},"image":{"@id":"https:\/\/skills.visual-paradigm.com\/ru\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/skills.visual-paradigm.com\/ru\/wp-json\/wp\/v2\/docs\/1339","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skills.visual-paradigm.com\/ru\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skills.visual-paradigm.com\/ru\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skills.visual-paradigm.com\/ru\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/skills.visual-paradigm.com\/ru\/wp-json\/wp\/v2\/docs\/1339\/revisions"}],"predecessor-version":[{"id":2434,"href":"https:\/\/skills.visual-paradigm.com\/ru\/wp-json\/wp\/v2\/docs\/1339\/revisions\/2434"}],"up":[{"embeddable":true,"href":"https:\/\/skills.visual-paradigm.com\/ru\/wp-json\/wp\/v2\/docs\/1335"}],"wp:attachment":[{"href":"https:\/\/skills.visual-paradigm.com\/ru\/wp-json\/wp\/v2\/media?parent=1339"}],"wp:term":[{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skills.visual-paradigm.com\/ru\/wp-json\/wp\/v2\/doc_tag?post=1339"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}