Glossary of Key Terms in BPR and BPMN

Estimated reading: 8 minutes 7 views

In a recent audit of three enterprise-level re-engineering initiatives, the same confusion reappeared: teams misusing ‘gateway’ and ‘event’ in BPMN diagrams, leading to flawed decision logic. It wasn’t a technical failure—it was a language problem. Misunderstanding foundational BPMN terms can derail entire redesign efforts, even when the team is technically proficient.

Over two decades in business transformation have taught me one truth: clarity begins with naming. The vocabulary of BPR and BPMN isn’t just a set of labels—it’s a shared language that defines how we see, model, and improve work. This glossary is not a dictionary, but a guide built from real-world experience. It’s designed for practitioners who need precise, context-rich definitions that reflect how these terms are used in actual modeling workflows.

If you’re working on a process model, leading a re-engineering project, or learning to visualize workflows, this BPR glossary will help you avoid common misunderstandings and speak the language of process innovation with confidence.

Core BPR Concepts

Business Process Re-Engineering (BPR)

BPR is not optimization—it’s radical reinvention. It means rethinking entire workflows from scratch to achieve dramatic improvements in cost, quality, service, and speed. Unlike incremental process improvement, BPR asks: “What if we started over?”

Real-world example: A healthcare provider replaced a 12-step patient onboarding process with a single digital form and automated eligibility checks. That wasn’t an optimization. It was BPR.

As-Is Process

The current state of a workflow—accurately documented as it exists today. This includes handoffs, delays, redundant steps, and system dependencies. The as-is model is not a critique. It’s a baseline.

Key tip: Never skip this phase. Skipping it leads to redesigning the wrong process. I’ve seen teams waste months on a ‘to-be’ model only to realize they misunderstood the as-is flow.

To-Be Process

The ideal future state of a process, designed after analyzing inefficiencies and aligning with strategic goals. It must be both visionary and executable.

Common mistake: Designing a to-be process with no consideration for existing systems. The model must be validated against technical feasibility—not just business logic.

Gap Analysis

A structured comparison between the as-is and to-be models to identify missing steps, duplicated work, system limitations, or skill gaps.

Use this not just to highlight issues, but to prioritize change. A gap analysis isn’t about blame—it’s about alignment.

Key BPMN Terms

Event

An occurrence that triggers or marks a point in a process. Events are represented by circles and categorized as: start, intermediate, or end events.

Distinguish between:
Start event (e.g., “Order received”)
Intermediate event (e.g., “Approval overdue”)
End event (e.g., “Order shipped”)

Real insight: Most modeling errors occur when users apply an intermediate event where a gateway or task should be. Be intentional about where events occur.

Activity

A work unit that takes time and resources. Activities are represented as rounded rectangles and can be atomic (task) or composite (sub-process).

Best practice: Keep activities small and actionable. A single activity should not span more than 30 minutes of work.

Gateway

A symbol that determines the path a flow takes based on conditions. Gateways are diamonds and indicate decision points.

Common types:
Exclusive (XOR): One and only one path is taken.
Parallel (AND): Multiple paths are followed simultaneously.
Inclusive (OR): One or more paths may be taken.

Warning: Avoid using XOR gateways for complex logic. They are error-prone. Use a decision table when logic exceeds three conditions.

Sequence Flow

A solid line with an arrow showing the order of activities. It connects events, activities, and gateways.

Note: Sequence flow is directional and cannot be reversed. If you see a reversed line, it’s likely a data flow or message flow, not a sequence flow.

Message Flow

A dashed line with an arrow used to represent communication between participants (e.g., departments, systems).

Use case: When modeling a workflow that spans multiple organizations or systems, message flow clarifies who sends what and when.

Swimlane

A section of the diagram that organizes activities by responsible role or department. Swimlanes can be horizontal or vertical.

Tip: Use swimlanes to clarify ownership. If a task appears in multiple swimlanes, it’s a red flag for unclear responsibility.

Process Modeling Definitions

Business Process Diagram (BPD)

A visual representation of a business process using BPMN standards. BPDs are used in both as-is and to-be modeling.

My advice: Never start modeling without first asking, “What’s the goal of this diagram?” A BPD meant for executives should focus on high-level flow. One for developers must include exception paths and data inputs.

Sub-Process

A process within a process. It’s an activity that contains its own internal flow, which can be expanded or collapsed.

Use case: When a step like “Process Customer Application” involves five internal tasks, model it as a sub-process to maintain clarity.

Choreography

A collaborative model showing interactions between participants (e.g., customer, system, bank). It doesn’t show detailed steps but focuses on message sequences.

Use when: You’re modeling cross-functional workflows involving multiple systems or stakeholders.

Conversation

A sequence of messages between two or more participants that fulfill a business goal.

Example: A customer’s order request → system validation → payment processing → fulfillment confirmation.

Decision Modeling and Logic

Decision Table

A structured format for modeling complex decision logic. It lists conditions, their possible values, and corresponding actions.

When to use: When you have more than three decision conditions, or when rules are prone to change.

Example:

Condition Rule 1 Rule 2 Rule 3
Order Over $100? Yes No Yes
Customer Premium? Yes Yes No
Action Free Shipping Standard Shipping Discount Applied

Use decision tables to validate logic before coding or automating.

Decision Requirement

A model element that represents a decision that must be made. It’s used in DMN (Decision Model and Notation) and can be linked to BPMN diagrams.

When modeling, use DMN for complex decisions. Avoid embedding decision logic directly in BPMN unless the rules are simple.

Common Pitfalls and How to Avoid Them

  • Mixing up events and activities: Events are triggers; activities are actions. A “Payment Received” is an event, not an activity.
  • Using multiple start events: Only one start event per process. Use message start events for external triggers.
  • Overusing parallel gateways: They increase complexity. Use them only when multiple parallel outcomes are required.
  • Ignoring swimlane boundaries: Misplaced tasks lead to confusion about ownership and accountability.
  • Modeling exceptions as normal flows: Use intermediate error events to handle exceptions properly.

Final Thoughts: The Power of Precision

Every time I’ve seen a BPR project stall, it wasn’t due to lack of effort. It was due to language drift—teams using the same terms to mean different things.

Mastering the BPR glossary isn’t about memorizing definitions. It’s about cultivating a shared understanding. When your team speaks BPMN and BPR using the same terms, you eliminate ambiguity, reduce rework, and build faster.

Use this glossary not just as a reference, but as a tool to align your team. Before you model a process, review the key terms together. It’s the first step toward true transformation.

Frequently Asked Questions

What is the difference between a BPMN event and a task?

An event is a point in time that signifies a change (e.g., “Payment Received”), while a task is a unit of work that takes time (e.g., “Process Payment”). Events do not consume time; tasks do.

How do I know when to use a gateway vs. a decision table?

Use a gateway for simple decisions (e.g., “Is payment approved?”). Use a decision table when logic becomes complex—more than three conditions or multiple rules.

Can a process have more than one start event?

No. A BPMN process should have only one start event. But you can have multiple start events if you define separate processes or use message start events for external triggers.

Why is swimlane important in process modeling?

Swimlanes clarify ownership. Without them, it’s impossible to determine who is responsible for a task, leading to delays and finger-pointing.

What is the role of a decision requirement in BPMN?

A decision requirement defines a decision that must be made. It’s typically linked to a DMN model and allows separation of business logic from workflow, enabling reuse and easier updates.

What are the most common mistakes in BPMN modeling?

Top three: confusing events with activities, misusing gateways (especially parallel), and omitting swimlanes. Always validate models with a peer from a different role to catch structural flaws early.

Share this Doc

Glossary of Key Terms in BPR and BPMN

Or copy link

CONTENTS
Scroll to Top